We’re thrilled to announce the distinguished recipients of the 2025 Project Empowerment Awards, recognizing excellence in lifecycle project management that...
Another quality control process that needs to be monitored, evaluated, and reported in the project control system (PCS) is the Static and RotatingEquipment Inspection Checklists. For oil and gas projects, static equipment comprises valves, boilers, furnaces, and...