Skip to content
Blog Categories

Resource Management

Resource Management
Search by module
PMWeb Announces the Winners of the 2025 Project Empowerment Awards
Assets Blog Portfolio Resource Management

PMWeb Announces the Winners of the 2025 Project Empowerment Awards

We’re thrilled to announce the distinguished recipients of the 2025 Project Empowerment Awards, recognizing excellence in lifecycle project management that...
Read More
Digitizing the Condition Assessment Process to Improve the Buildings and Outlets Maintenance Management
Blog Forms Portfolio Resource Management

Digitizing the Condition Assessment Process to Improve the Buildings and Outlets Maintenance Management

Public and private sector capital assets project owners usually have a policy for managing building maintenance to ensure that nothing...
Read More
Identifying and Recording the Details of All Major Maintenance and Recapitalization Projects Needed for the Successful Operation of Linear Capital Assets
Assets Blog Portfolio Resource Management

Identifying and Recording the Details of All Major Maintenance and Recapitalization Projects Needed for the Successful Operation of Linear Capital Assets

Project owners who have linear capital assets such as railways, metros, trams, highways, roads, gas and oil pipelines, sewage tunnel...
Read More
How Contractors and Subcontractors Track the Movement of All Assets Between Different Locations
Assets Blog Resource Management

How Contractors and Subcontractors Track the Movement of All Assets Between Different Locations

Every construction contractor and subcontractor has an extensive number of plants, equipment, tools, and other assets that are deployed at...
Read More
Capturing, Documenting, Monitoring, and Evaluating Beirut Explosion Buildings Damage Assessment
Assets Blog Resource Management Tools

Capturing, Documenting, Monitoring, and Evaluating Beirut Explosion Buildings Damage Assessment

The horrible Beirut Port explosion, in addition to causing the catastrophic death of almost 200 innocent people as well as...
Read More
Using Project Management Information Systems to Improve the Management of Capital Projects Adopting Offsite Manufacturing
Blog Project Management Office (PMO) Resource Management Tools

Using Project Management Information Systems to Improve the Management of Capital Projects Adopting Offsite Manufacturing

The COVID-19 pandemic has increased the interest in adopting offsite manufacturing on capital projects, sometimes called Design for Manufacture and...
Read More
Ensuring GDPR Compliance for the Project Management Information System Selected to Manage Your Construction Project Delivery
Blog Portfolio Resource Management Workflow

Ensuring GDPR Compliance for the Project Management Information System Selected to Manage Your Construction Project Delivery

The GDPR (General Data Protection Regulation) as well as other similar regulations which came into force both in European Union,...
Read More
How Can Technology Improve the Monitoring and Reporting of the Delivery, Storage, and Release of Equipment and Materials to Construction Sites?
Blog Costs Plans Resource Management

How Can Technology Improve the Monitoring and Reporting of the Delivery, Storage, and Release of Equipment and Materials to Construction Sites?

One of the key requirements that need to be managed, monitored, and reported on construction projects is the delivery, storage,...
Read More
Formalizing Comprehensive, Transparent, and Unbiased Interview Questions for Approving Project Team Members to be Deployed on Construction Sites
Blog Resource Management

Formalizing Comprehensive, Transparent, and Unbiased Interview Questions for Approving Project Team Members to be Deployed on Construction Sites

One of the common practices in construction projects is the requirement to interview the project team members proposed by the...
Read More
The Great Value of Capturing Project Team Members’ Feedback on Projects’ Performance
Blog Resource Management Schedules

The Great Value of Capturing Project Team Members’ Feedback on Projects’ Performance

Project Management Information System (PMIS) like PMWeb are the solutions that are best suited to capture the details of the...
Read More
Setting the Project Control System (PCS) Quality Management Module: Static and Rotating Equipment Inspection Checklists
Blog Quality Management Resource Management Tools

Setting the Project Control System (PCS) Quality Management Module: Static and Rotating Equipment Inspection Checklists

Another quality control process that needs to be monitored, evaluated, and reported in the project control system (PCS) is the Static and RotatingEquipment Inspection Checklists. For oil and gas projects, static equipment comprises valves, boilers, furnaces, and...
Read More
Setting the Project Control System (PCS) Cost Management Module: Forecast Management
Blog Contract Management Costs Resource Management Schedules

Setting the Project Control System (PCS) Cost Management Module: Forecast Management

Regardless of whose perspective the project control system is managed, both the project owner and his team as well as...
Read More
Setting the Project Control System (PCS) Cost Management Module: Change Management
Blog Cost Management Costs Forms Resource Management Schedules

Setting the Project Control System (PCS) Cost Management Module: Change Management

There is a very slim chance that a construction project is completed without encountering changes. There are many events that...
Read More
Setting the Project Control System (PCS) Cost Management Module: Managing the Project Commitments
Blog Cost Management Costs Portfolio Resource Management Tools

Setting the Project Control System (PCS) Cost Management Module: Managing the Project Commitments

Commitments are the contract agreements for which the actual cost for delivering the project’s scope of work is per the...
Read More
Setting the Project Control System (PCS) Cost Management Module: Managing the Project Budget
Blog Cost Management Costs Resource Management

Setting the Project Control System (PCS) Cost Management Module: Managing the Project Budget

By definition, a project budget is the total estimated cost of completing each project activity over each phase of a...
Read More
Setting the Project Control System (PCS) Cost Management Module: Definite Cost Estimate
Blog Contract Management Cost Management Multilingual Multi-currency Plans Portfolio Resource Management Schedules

Setting the Project Control System (PCS) Cost Management Module: Definite Cost Estimate

The third Project Control System (PCS) module needed for construction projects is the cost management module. In doing so, it...
Read More
Setting the Project Control System (PCS) Schedule and Resource Management Module: Schedule Performance Reporting
Assets Blog Building Information Models (BIM) Project Management Office (PMO) Resource Management Schedules Tools

Setting the Project Control System (PCS) Schedule and Resource Management Module: Schedule Performance Reporting

Function 5: Schedule Performance Reporting In addition to the wide variety of the schedule performance reports that could be either...
Read More
Setting the Project Control System (PCS) Schedule and Resource Management Module: Schedule Delays
Assets Blog Building Information Models (BIM) Forms Project Management Office (PMO) Resource Management Schedules Tools

Setting the Project Control System (PCS) Schedule and Resource Management Module: Schedule Delays

Function 4: Schedule Delays  On construction projects, schedule delay claims that affect the project completion date are becoming a common...
Read More
Setting the Project Control System (PCS) Schedule and Resource Management Module: Updated Schedules
Blog Forms Project Management Office (PMO) Resource Management Tools

Setting the Project Control System (PCS) Schedule and Resource Management Module: Updated Schedules

Function 2: Schedule Update Although the Activity Boards has the details of the actual progress achieved on the project, nevertheless...
Read More
Setting the Project Control System (PCS) Schedule and Resource Management Module: Two-Week Look Ahead Planning
Blog Project Management Office (PMO) Resource Management Schedules Tools

Setting the Project Control System (PCS) Schedule and Resource Management Module: Two-Week Look Ahead Planning

The approved baseline schedule becomes the basis for the short-term planning that is used to execute the project. On a...
Read More