One of the quality controls processes that exists on any construction project for which a project control system (PCS) reports is the Punch List or Snag List. The traditional approach to using this...
Another quality control process that needs to be monitored, evaluated, and reported in the project control system (PCS) is the Static and RotatingEquipment Inspection Checklists. For oil and gas projects, static equipment comprises valves, boilers, furnaces, and...